The raw water intake is the only piece of new infrastructure that would be installed in the river itself. To mitigate for impacts to the river from the construction of the intake, EWEB would create an enhanced fish habitat nearby to offset the loss of natural riverbank. A site plan, cross-section and landscape sketch of the mitigation is included below.
Riverbank Mitigation Site Plan
Riverbank Mitigation Cross-Section
Landscape Sketch